Modular Construction Case Study

Modular Construction Case Study

Industry

Hospitality

Client

Marriott Hotel Developers

Initial Situation

Needed a streamlined process to reduce time, delays, and cost

Challenges:

  • Long construction timelines.
  • High costs associated with traditional construction methods.
  • Need for consistent quality across multiple locations.
  • Delays caused by weather and site conditions.

Objectives:

  • Reduce construction time and costs.
  • Ensure consistent quality across all new hotel projects.
  • Minimize delays and disruptions caused by external factors.

TOC Approach:

  1. Modular Construction:
    • Implemented modular construction techniques, where hotel rooms and other components were pre-fabricated off-site in a controlled environment.
  2. Standardized Designs:
    • Developed standardized designs for hotel rooms and common areas to ensure consistency and quality across all locations.
  3. Just-In-Time Delivery:
    • Coordinated just-in-time delivery of modular components to the construction site, reducing on-site storage needs and minimizing disruptions.
  4. Integrated Project Management:
    • Utilized integrated project management tools to monitor progress, manage logistics, and ensure timely completion of each project phase.

Implementation:

  • Off-Site Fabrication: Hotel rooms and other components were manufactured in a factory setting, allowing for precise control over quality and specifications.
  • On-Site Assembly: Once delivered to the site, the modular components were quickly assembled, significantly reducing the overall construction timeline.

Results:

  • Reduced Construction Time: Construction time was reduced by up to 50% compared to traditional methods.
  • Cost Savings: Significant cost savings were achieved through efficient use of materials and reduced labor costs.
  • Consistent Quality: Standardized designs and controlled fabrication ensured high-quality construction across all new hotels.
  • Minimized Delays: External factors such as weather and site conditions had minimal impact on the construction timeline.

Lessons Learned:

Coordination and Planning: Successful implementation of modular construction requires careful coordination and planning, particularly in logistics and project management.

Efficiency of Modular Construction: Modular construction proved to be an efficient and cost-effective solution for large-scale projects.

Importance of Standardization: Standardized designs helped maintain consistent quality and streamlined the construction process.